JDEdwards EnterpriseOne Manufacturing MCQ
This JDEdwards EnterpriseOne Manufacturing MCQ Quiz contains few questions as a online practice test.
1. Pre-requisites is to turn on the System Code for Grower management _________
a ) SY37G
b) SY40G
c ) SY37
d ) SY34
2. Prerequisite set ups for Grower
a) Set up financial data
b) set up procurement
c) set up manufacturing
d) A&B
3. A company makes bicycles for the consumer market. The demand for the bicycles is 1000 per
week. The three operations to produce a bicycle is frame assembly, wheel assembly, and final
assembly.
a) 1000
b) 950
c) 1500
d) 1200
4. How is the start date calculated on Work order when only request date is given as input
a) Based on Manufacturing lead time defined at Finish Item Branch level
b) Based on Level lead time defined at Finish Item Branch level
c) Based on comulative lead time defined at Finish Item Branch level
d) Based on Item and Branch Plant Cost level
5. If the Prime Load Code is C or M, the system uses the total ‘——– hours for back scheduling
a) Total Labor Hrs
b) Total Machine Hrs
c) Total Setup Hrs
d) Total of Labor & Machine Hrs