JDEdwards EnterpriseOne Manufacturing MCQ Quiz -Part-1

JDEdwards EnterpriseOne Manufacturing

This JDEdwards EnterpriseOne Manufacturing MCQ quiz contains few questions as a online practice test.

1. Product A can be produced at the rate of 60 per hour or one each minute. ; This time is known as
the:

a) Standard rate
b) Cycle time
c) Capacity rate
d) Setup time

2. Tools for calculating the liquid volume within tanks.

a) Plank Tank
b) Dip Chart
c) Cooper
d) Racking Valve

3. ————– indicate changes in inventory value

a) Item Ledger
b) Cost Ledger
c) Account Ledger
d) Item Master

4. ———– indicates whether a work center has labor, material, or both, backflushed through it when
quantities are reported against operations occurring in the work center

a) Time Basis
b) Issue Type Code
c) Pay Point Code
d) Pay Point time

5. ATO stands for

a) assemble to order
b) add to order
c) address to order
d) advertisement to order